Building Construction Quiz-1

Test your knowledge with Building Construction quizzes from expert civil quiz! How informed are you on topics? Find out by taking the quizzes below!

0%
3

Building Construction Set – 1

1 / 25

In soils possessing low bearing capacity, the type of foundation generally provided, is

2 / 25

The bearing capacity of a water logged soil can be improved by

3 / 25

The maximum total settlement for isolated foundations on clayey soils should be limited to

4 / 25

Cast iron piles

5 / 25

The number of steps in a flight generally should not be less than

6 / 25

A wall constructed with stones to protect slopes of cuttings in natural ground from the action of
weathering agents, is called

7 / 25

For each storey of a building, the depth of exploration should be

8 / 25

The service area in a building means the area occupied by

9 / 25

The form work from the slabs excluding props, can be removed only after

10 / 25

The minimum strength of the mortar used in load-bearing brick masonry, is

11 / 25

The type of arch generally constructed over a wooden lintel or over a flat arch for the purpose of
carrying the load of the wall above is

12 / 25

The columns of multi-storeyed buildings are designed to withstand the forces due to

13 / 25

To obtain good bonding in brick masonry

14 / 25

Open test pit is only suitable upto a depth of

15 / 25

The type of roof which slopes in two directions with a break in the slope on each side is known as

16 / 25

The pile which supports the load due to friction between pile face and surrounding soil, is
generally known as

17 / 25

The wedge shaped bricks forming an arch ring, are called

18 / 25

The platform at the end of a series of steps, is known as

19 / 25

The inclined surface of an abutment to receive the arch, is known as

20 / 25

Pick up the correct statement from the following:

21 / 25

For different layers of cement concrete floor. Pick up the incorrect statement from the following:

22 / 25

The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of
the masonry and bottom is kept flushed with face of wall, is

23 / 25

The process of filling hollow spaces of walls before plastering, is known

24 / 25

The foundation which consists of a thick reinforced cement slab covering whole area to support
heavy concentrated structural loads, is known as

25 / 25

As compared to stretcher course, the thickness of joints in header course should be

Your score is

The average score is 23%

0%



DO YOU WANT  TO STUDY FIRST? 

Please choose the below topics that you want to improve: 

Bricks
Construction
Soil
Concrete
Gypsum 
Tiles