The shuttering time for a slab depends on the size and complexity of the slab, the type of formwork used, temperature, humidity, and other variables. Generally, the shuttering time for a slab can range from 4 to 7 days, but it can take longer depending on the location and conditions.
The shuttering time for a slab depends on the size and complexity of the slab, the type of formwork used, temperature, humidity, and other variables. Generally, the shuttering time for a slab can range from 4 to 7 days, but it can take longer depending on the location and conditions.