Sign Up

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Have an account? Sign In
Continue with Facebook
Continue with Google
or use


Have an account? Sign In Now

Sign In

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Sign Up Here
Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have permission to ask a question, You must login to ask a question.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add post.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Expert Civil Logo Expert Civil Logo
Sign InSign Up

Expert Civil

Expert Civil Navigation

  • Articles
  • QnA
  • Quizzes
Search
Ask A Question

Mobile menu

Close
Ask A Question
  • Articles
  • QnA
  • Quizzes
  • Home
  • Resources
    • PDF
      • Question Papers
      • Notes
      • E Books
      • Interview Ques.
    • Templates
    • Project Reports
    • Spreadsheets
    • PPTs
    • House Plans
  • Subjects
    • Estimation & Costing
    • Building Materials
      • ⮞ Aggregate
      • ⮞ Brick
      • ⮞ Cement
      • ⮞ Concrete
      • ⮞ Mortar
      • ⮞ Sand
      • ⮞ Steel
    • Building Construction
    • Geotechnical
      • ⮞ Foundation
      • ⮞ Geology
      • ⮞ Soil Mechanics
      • ⮞ Site Investigation
    • Environmental Eng.
    • Structural Eng.
      • ⮞ Structural Design
    • Earthquake Eng.
    • Transportation Eng.
      • ⮞ Railway
      • ⮞ Bridge
      • ⮞ Highway
      • ⮞ Tunnel
    • Construction Mgmt.
    • Water Resource Eng.
      • ⮞ Fluid Mechanics
      • ⮞ Irrigation
      • ⮞ Hydrology
      • ⮞ Hydraulics
    • Irrigation
    • Surveying
  • Software
    • Autocad
    • 3Ds Max
    • Staad Pro
  • Marketplace
Home| Questions|Q 71196
Next
Answered
aalan

Expert Civil Latest Questions

Varun Kumar
Varun Kumar
Asked: June 4, 20222022-06-04T17:10:19+05:30 2022-06-04T17:10:19+05:30In: Highway Engineering

Explain in detail the maintenace of bituminous roads

  • 2
  • 2
  • 1 1 Answer
  • 451 Views
  • 1 Follower
  • 0
Answer
Share
  • Facebook

    1 Answer

    • Voted
    • Recent
    • Oldest
    • Random
    1. govardhan karnam
      Best Answer
      govardhan karnam
      2022-06-05T16:35:55+05:30Added an answer on June 5, 2022 at 4:35 pm

      Bituminous roads are the most widely used. It is made up of flexible pavement. Bituminous roads frequently necessitate routine maintenance. 1. Patching Pot Holes: Potholes form on the road surface because of excessive traffic, varying climatic conditions, a variety of traffic, and poor quality, andRead more

      Bituminous roads are the most widely used. It is made up of flexible pavement. Bituminous roads frequently necessitate routine maintenance.

      1. Patching Pot Holes:

      Potholes form on the road surface because of excessive traffic, varying climatic conditions, a variety of traffic, and poor quality, and must be treated.
      In the case of fixing potholes, they are first carved square or rectangular in shape up to the required depth. A suitable tack coat or bituminous coat is applied after the holes have been cleaned and broomed adequately.
      After that, a premixed patching mix is poured in the holes with crowbars, and the surface is rammed and rolled. The finished surface or potholes are kept slightly above the average surface for traffic compaction. In the winter, cut back or emulsions are utilized as a replenishing substance to fill potholes.

      2. Patching Ruts:

      Ruts are longitudinal depressions or cuts generated in flexible pavement.

      A continuous trench is dug around the ruts to establish a sturdy foundation for the patch when repairing ruts. After then, patching is done in the same way as potholes are patched.

      3. Patching Corrugations:

      Corrugations are installed on bituminous roads to prevent bleeding, which is common during the summer. This can be remedied by cutting the crests or high ridges of corrugations.

      Up to the depth of the depressions, which are cleaned, painted, and filled with the premix material.

      4. Base Repairs:

      This repair falls under the category of preventative maintenance, in which the root cause of the problem is established first, followed by the best solution. If it is determined that the problem is caused by a lack of base course thickness, the deficiency is fixed or addressed by adding more surface thickness.

      When repairing a base, the existing surface is first loosened by scarifying it to the full depth.

      The new base is then laid down in layers no thicker than 75 mm and finished with a surface finish.

      5. Surface Treatment:

      Bituminous surface bleeding is managed by applying a layer of blotting material as soon as it appears to be bleeding. Rolling is done, if necessary, for example, with aggregate chippings or coarse sand.

      When the fractures on the road surface have formed, a renewal coat or seal coat is applied.

      6. Re-surfacing:

      Resurfacing is the process of renewing or surface dressing a pavement that has been significantly damaged or has reached the end of its functional life.

      If the present wearing course of a bituminous road is nearly or completely worn out, the road becomes unfit for traffic and must be completely resurfaced.

      Potholes are repaired using a replenishing substance such as cut back or emulsions in the winter. After that, a light tack coat is applied to the surface, followed by surface dressing.

      See less
        • 2
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp

    You must login to add an answer.

    Continue with Facebook
    Continue with Google
    or use


    Forgot Password?

    Need An Account, Sign Up Here

    Related Questions

    • Describe loss due to relaxation of stress in steel
    • What are various notations and sign conventions used in the analysis of prestressing?
    • Write a short note on stress in tendons
    • What is the basic concept of prestressing?
    • Enlist various application of prestressed to various building elements
    aalan

    Sidebar

    Advertisement

    Subscribe

    Recent Posts

    • Vipin Chauhan

      Maximizing Your Budget: Why Dry Hiring a Dozer Makes Financial Sense

    • Vipin Chauhan

      The Role of Parging in Protecting Your Home’s Foundation

    • Vipin Chauhan

      A Beginner’s Guide to PVC Plumbing: What You Need to Know

    • Vipin Chauhan

      Essential Plumbing Tools List: Must-Have Tools for Every Plumber

    Advertisement

    Recent Questions

    • Mahima Singh

      Which state government has launched the pucca ghar yojana for construction workers?

      • 1 Answer
    • Oliva Jones

      How to remove sliding patio door?

      • 1 Answer
    • Varun Kumar

      How do japanese predict earthquakes?

      • 1 Answer
    • Varun Kumar

      State the law of vector subtraction.

      • 0 Answers

    Explore

    • Home
    • Resources
      • PDF
        • Question Papers
        • Notes
        • E Books
        • Interview Ques.
      • Templates
      • Project Reports
      • Spreadsheets
      • PPTs
      • House Plans
    • Subjects
      • Estimation & Costing
      • Building Materials
        • ⮞ Aggregate
        • ⮞ Brick
        • ⮞ Cement
        • ⮞ Concrete
        • ⮞ Mortar
        • ⮞ Sand
        • ⮞ Steel
      • Building Construction
      • Geotechnical
        • ⮞ Foundation
        • ⮞ Geology
        • ⮞ Soil Mechanics
        • ⮞ Site Investigation
      • Environmental Eng.
      • Structural Eng.
        • ⮞ Structural Design
      • Earthquake Eng.
      • Transportation Eng.
        • ⮞ Railway
        • ⮞ Bridge
        • ⮞ Highway
        • ⮞ Tunnel
      • Construction Mgmt.
      • Water Resource Eng.
        • ⮞ Fluid Mechanics
        • ⮞ Irrigation
        • ⮞ Hydrology
        • ⮞ Hydraulics
      • Irrigation
      • Surveying
    • Software
      • Autocad
      • 3Ds Max
      • Staad Pro
    • Marketplace
    aalan

    Footer

    • About Us
    • Contact Us
    • Privacy Policy
    • Write for Us
    • Add Post
    • Badges
    • Rules
    • FAQ
    • Quizzes
    • Market
    • Articles
    • Q&A

    © 2023 Expertcivil. All Rights Reserved