1. Visual inspection: Inspect the column visually to ensure the shuttering is properly set up and that there are no gaps or loose parts. 2. Measurement: Use a level and a tape measure to take precise measurements of the shuttering and compare it against the plans and drawings. 3. Test Load: PerformRead more
1. Visual inspection: Inspect the column visually to ensure the shuttering is properly set up and that there are no gaps or loose parts.
2. Measurement: Use a level and a tape measure to take precise measurements of the shuttering and compare it against the plans and drawings.
3. Test Load: Perform a test load on the shuttering using a weight or other means to ensure it can withstand the expected loads.
4. Safety Checks: Ensure the shuttering has been securely fastened and all appropriate safety measures have been followed.