Sign Up

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Have an account? Sign In
Continue with Facebook
Continue with Google
or use


Have an account? Sign In Now

Sign In

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Sign Up Here
Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have permission to ask a question, You must login to ask a question.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add post.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Expert Civil Logo Expert Civil Logo
Sign InSign Up

Expert Civil

Expert Civil Navigation

  • Articles
  • QnA
  • Quizzes
Search
Ask A Question

Mobile menu

Close
Ask A Question
  • Articles
  • QnA
  • Quizzes
  • Home
  • Resources
    • PDF
      • Question Papers
      • Notes
      • E Books
      • Interview Ques.
    • Templates
    • Project Reports
    • Spreadsheets
    • PPTs
    • House Plans
  • Subjects
    • Estimation & Costing
    • Building Materials
      • ⮞ Aggregate
      • ⮞ Brick
      • ⮞ Cement
      • ⮞ Concrete
      • ⮞ Mortar
      • ⮞ Sand
      • ⮞ Steel
    • Building Construction
    • Geotechnical
      • ⮞ Foundation
      • ⮞ Geology
      • ⮞ Soil Mechanics
      • ⮞ Site Investigation
    • Environmental Eng.
    • Structural Eng.
      • ⮞ Structural Design
    • Earthquake Eng.
    • Transportation Eng.
      • ⮞ Railway
      • ⮞ Bridge
      • ⮞ Highway
      • ⮞ Tunnel
    • Construction Mgmt.
    • Water Resource Eng.
      • ⮞ Fluid Mechanics
      • ⮞ Irrigation
      • ⮞ Hydrology
      • ⮞ Hydraulics
    • Irrigation
    • Surveying
  • Software
    • Autocad
    • 3Ds Max
    • Staad Pro
  • Marketplace
Home| Questions|Q 106947
Next
In Process
aalan

Expert Civil Latest Questions

Varun Kumar
Varun Kumar
Asked: May 11, 20232023-05-11T10:59:00+05:30 2023-05-11T10:59:00+05:30In: Communication Skills

Identify the sentence that uses proper subject-verb agreement.

Option A: The project manager and the team was working on the plans.
Option B: The construction workers is trained in safety procedures.
Option C: The bridge that connects the two cities are made of steel.
Option D: The deadline for the project has been extended.

  • 0
  • 0
  • 1 1 Answer
  • 471 Views
  • 0 Followers
  • 0
Answer
Share
  • Facebook

    1 Answer

    • Voted
    • Recent
    • Oldest
    • Random
    1. Mahima Singh
      Mahima Singh
      2023-05-11T10:59:00+05:30Added an answer on May 11, 2023 at 10:59 am

      Answer: The correct answer is Option D. The sentence has a singular subject "deadline" and a singular verb "has been extended". Explanation: Option A is incorrect because the subject "project manager" and "team" are two separate entities and should be followed by the plural verb "were working". OptiRead more

      Answer: The correct answer is Option D. The sentence has a singular subject “deadline” and a singular verb “has been extended”.
      Explanation: Option A is incorrect because the subject “project manager” and “team” are two separate entities and should be followed by the plural verb “were working”. Option B is incorrect because the subject “construction workers” is plural and should be followed by the plural verb “are trained”. Option C is incorrect because the subject “bridge” is singular and should be followed by the singular verb “is made”. Option D is correct because the subject “deadline” is singular and should be followed by the singular verb “has been extended”.

      See less
        • 0
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp

    You must login to add an answer.

    Continue with Facebook
    Continue with Google
    or use


    Forgot Password?

    Need An Account, Sign Up Here

    Related Questions

    • Which of the following sentences correctly uses an apostrophe?
    • Which of the following sentences uses punctuation correctly?
    • Identify the sentence with correct use of punctuation.
    • Identify the sentence with correct use of articles.
    • Identify the sentence with correct use of prepositions.
    aalan

    Sidebar

    Advertisement

    Subscribe

    Recent Posts

    • Vipin Chauhan

      Septic Tank Additives: Miracle Solutions or Money Wasters?

    • Vipin Chauhan

      Maximizing Your Budget: Why Dry Hiring a Dozer Makes Financial Sense

    • Vipin Chauhan

      The Role of Parging in Protecting Your Home’s Foundation

    • Vipin Chauhan

      A Beginner’s Guide to PVC Plumbing: What You Need to Know

    Advertisement

    Recent Questions

    • Varun Kumar

      How to draw a perpendicular line in autocad?

      • 1 Answer
    • Varun Kumar

      Why do earthquakes occur before a volcano erupts?

      • 1 Answer
    • Varun Kumar

      How to decorate staircase for wedding?

      • 1 Answer
    • Varun Kumar

      What is home inspection?

      • 1 Answer

    Explore

    • Home
    • Resources
      • PDF
        • Question Papers
        • Notes
        • E Books
        • Interview Ques.
      • Templates
      • Project Reports
      • Spreadsheets
      • PPTs
      • House Plans
    • Subjects
      • Estimation & Costing
      • Building Materials
        • ⮞ Aggregate
        • ⮞ Brick
        • ⮞ Cement
        • ⮞ Concrete
        • ⮞ Mortar
        • ⮞ Sand
        • ⮞ Steel
      • Building Construction
      • Geotechnical
        • ⮞ Foundation
        • ⮞ Geology
        • ⮞ Soil Mechanics
        • ⮞ Site Investigation
      • Environmental Eng.
      • Structural Eng.
        • ⮞ Structural Design
      • Earthquake Eng.
      • Transportation Eng.
        • ⮞ Railway
        • ⮞ Bridge
        • ⮞ Highway
        • ⮞ Tunnel
      • Construction Mgmt.
      • Water Resource Eng.
        • ⮞ Fluid Mechanics
        • ⮞ Irrigation
        • ⮞ Hydrology
        • ⮞ Hydraulics
      • Irrigation
      • Surveying
    • Software
      • Autocad
      • 3Ds Max
      • Staad Pro
    • Marketplace
    aalan

    Footer

    • About Us
    • Contact Us
    • Privacy Policy
    • Write for Us
    • Add Post
    • Badges
    • Rules
    • FAQ
    • Quizzes
    • Market
    • Articles
    • Q&A

    © 2023 Expertcivil. All Rights Reserved