Get Access to:
Get Access to:
Lost your password? Please enter your email address. You will receive a link and will create a new password via email.
Please briefly explain why you feel this question should be reported.
Please briefly explain why you feel this answer should be reported.
Please briefly explain why you feel this user should be reported.
The slope of the line joining the crown and edge of the road surface is known as ?
Any one of the above
Any one of the above
See lessAccording to IRC recommendations, the maximum spacing of a transverse expansion joint is unreinforced concrete pavements for a slab thickness of 20 cm should be ?
#VALUE!
#VALUE!
See lessTie bars in longitudinal joints in concrete pavements ?
All of the above
All of the above
See lessThe increase in traffic volume, due to the general increase in the number of transport vehicle from year to year, is known as ?
Normal traffic growth
Normal traffic growth
See lessThe rate of rise or fall of the road surface along its length, is called ?
Gradient
Gradient
See lessAn essential gradient, which has to be provided for the purpose of road drainage, is called ?
Minimum gradient
Minimum gradient
See lessThe longest distance at which a driver, whose line of sight is 1.2 m above the road surface, can see the top of an object 10 cm high on the surface of road, is called ?
Stopping or non-passing sight distance
Stopping or non-passing sight distance
See less