Get Access to:
Get Access to:
Lost your password? Please enter your email address. You will receive a link and will create a new password via email.
Please briefly explain why you feel this question should be reported.
Please briefly explain why you feel this answer should be reported.
Please briefly explain why you feel this user should be reported.
The commonly used lime for works under water or in damp situations is ?
Eminently Hydraulic Lime
Eminently Hydraulic Lime
See lessIn order to measure a horizontal angle more accurately than a vernier, a ?
Method of repetition is used
Method of repetition is used
See lessThe aggregate which pass through 4.75 mm IS sieve and entirely retain on 75 micron IS sieve called ?
Fine Aggregate
Fine Aggregate
See lessThe operation of turning the table so that all the lines on the paper are parallel to the corresponding lines on the ground, is called ?
Orientation
Orientation
See lessThe ordinary concrete is not used for ________ grade of concrete mix ?
M 40
M 40
See lessThe dolomite bricks are ?
Basic Refractory Bricks
Basic Refractory Bricks
See lessA base line in a chain survey ?
Fixes up the directions of all other lines
Fixes up the directions of all other lines
See less