Sign Up

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Have an account? Sign In
Continue with Facebook
Continue with Google
or use


Have an account? Sign In Now

Sign In

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Sign Up Here
Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have permission to ask a question, You must login to ask a question.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add post.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Expert Civil Logo Expert Civil Logo
Sign InSign Up

Expert Civil

Expert Civil Navigation

  • Articles
  • QnA
  • Quizzes
Search
Ask A Question

Mobile menu

Close
Ask A Question
  • Articles
  • QnA
  • Quizzes
  • Home
  • Resources
    • PDF
      • Question Papers
      • Notes
      • E Books
      • Interview Ques.
    • Templates
    • Project Reports
    • Spreadsheets
    • PPTs
    • House Plans
  • Subjects
    • Estimation & Costing
    • Building Materials
      • ⮞ Aggregate
      • ⮞ Brick
      • ⮞ Cement
      • ⮞ Concrete
      • ⮞ Mortar
      • ⮞ Sand
      • ⮞ Steel
    • Building Construction
    • Geotechnical
      • ⮞ Foundation
      • ⮞ Geology
      • ⮞ Soil Mechanics
      • ⮞ Site Investigation
    • Environmental Eng.
    • Structural Eng.
      • ⮞ Structural Design
    • Earthquake Eng.
    • Transportation Eng.
      • ⮞ Railway
      • ⮞ Bridge
      • ⮞ Highway
      • ⮞ Tunnel
    • Construction Mgmt.
    • Water Resource Eng.
      • ⮞ Fluid Mechanics
      • ⮞ Irrigation
      • ⮞ Hydrology
      • ⮞ Hydraulics
    • Irrigation
    • Surveying
  • Software
    • Autocad
    • 3Ds Max
    • Staad Pro
  • Marketplace
Home| Questions|Q 71195
Next
In Process
aalan

Expert Civil Latest Questions

Varun Kumar
Varun Kumar
Asked: June 4, 20222022-06-04T17:10:19+05:30 2022-06-04T17:10:19+05:30In: Highway Engineering

Explain the merit and demerit of rigid pavement

  • 1
  • 1
  • 1 1 Answer
  • 549 Views
  • 1 Follower
  • 0
Answer
Share
  • Facebook

    1 Answer

    • Voted
    • Recent
    • Oldest
    • Random
    1. govardhan karnam
      govardhan karnam
      2022-06-05T16:30:41+05:30Added an answer on June 5, 2022 at 4:30 pm

      Merits: • In wet weather or when exposed to stagnant water, CC pavements do not deteriorate. • CC pavements on important highways are often designed and constructed for a 30-year term, so their service life could be 30 years or more. • CC pavements have a substantially lower life cycle cost than fleRead more

      Merits:

      • In wet weather or when exposed to stagnant water, CC pavements do not deteriorate.
      • CC pavements on important highways are often designed and constructed for a 30-year term, so their service life could be 30 years or more.
      • CC pavements have a substantially lower life cycle cost than flexible pavements.
      • The total thickness of CC pavement and the number of hard aggregates required is less than flexible pavements, which is especially important for highways passing through weak soils and carrying heavy traffic loads.

      Demerits:

      • To lower the life cycle cost of CC pavement, it should be designed to last at least 30 years. The CC pavement design wheel load is not the same as the conventional wheel load. A CC pavement that has failed or is extensively cracked is impossible to repair.
      • The CC pavement’s surface is likely to become overly smooth and slippery over time, and re-texturing the CC pavement is difficult or prohibitively expensive.
      • Before opening to traffic, a 28-day curing time is usually required. When it comes to creating CC pavements on congested city streets, this could be a disadvantage.

      See less
        • 2
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp

    You must login to add an answer.

    Continue with Facebook
    Continue with Google
    or use


    Forgot Password?

    Need An Account, Sign Up Here

    Related Questions

    • Discuss pretension method with their suitability?
    • Describe the concept of load balancing
    • What is elastic shortening? Briefly Explain
    • Briefly explain creep coefficient method of concrete?
    • Describe loss due to relaxation of stress in steel
    aalan

    Sidebar

    Advertisement

    Subscribe

    Recent Posts

    • Vipin Chauhan

      Septic Tank Additives: Miracle Solutions or Money Wasters?

    • Vipin Chauhan

      Maximizing Your Budget: Why Dry Hiring a Dozer Makes Financial Sense

    • Vipin Chauhan

      The Role of Parging in Protecting Your Home’s Foundation

    • Vipin Chauhan

      A Beginner’s Guide to PVC Plumbing: What You Need to Know

    Advertisement

    Recent Questions

    • Varun Kumar

      How to make a book in 3ds max?

      • 1 Answer
    • Mohd Mujtaba

      The aggregate which pass through 75 mm IS sieve and entirely retain on 4.75 mm IS sieve is known as ?

      • 1 Answer
    • Mahima Singh

      What is the function of skimmer in wastewater treatment plant?

      • 1 Answer
    • Mahima Singh

      What to do after btech in civil engineering?

      • 1 Answer

    Explore

    • Home
    • Resources
      • PDF
        • Question Papers
        • Notes
        • E Books
        • Interview Ques.
      • Templates
      • Project Reports
      • Spreadsheets
      • PPTs
      • House Plans
    • Subjects
      • Estimation & Costing
      • Building Materials
        • ⮞ Aggregate
        • ⮞ Brick
        • ⮞ Cement
        • ⮞ Concrete
        • ⮞ Mortar
        • ⮞ Sand
        • ⮞ Steel
      • Building Construction
      • Geotechnical
        • ⮞ Foundation
        • ⮞ Geology
        • ⮞ Soil Mechanics
        • ⮞ Site Investigation
      • Environmental Eng.
      • Structural Eng.
        • ⮞ Structural Design
      • Earthquake Eng.
      • Transportation Eng.
        • ⮞ Railway
        • ⮞ Bridge
        • ⮞ Highway
        • ⮞ Tunnel
      • Construction Mgmt.
      • Water Resource Eng.
        • ⮞ Fluid Mechanics
        • ⮞ Irrigation
        • ⮞ Hydrology
        • ⮞ Hydraulics
      • Irrigation
      • Surveying
    • Software
      • Autocad
      • 3Ds Max
      • Staad Pro
    • Marketplace
    aalan

    Footer

    • About Us
    • Contact Us
    • Privacy Policy
    • Write for Us
    • Add Post
    • Badges
    • Rules
    • FAQ
    • Quizzes
    • Market
    • Articles
    • Q&A

    © 2023 Expertcivil. All Rights Reserved