Generally, the curing process for concrete should last 7-28 days after the shuttering is removed, depending on the ambient temperature and other environmental conditions. During the curing period, the concrete should be kept moist by spraying it with water or covering it with plastic sheeting.
Generally, the curing process for concrete should last 7-28 days after the shuttering is removed, depending on the ambient temperature and other environmental conditions. During the curing period, the concrete should be kept moist by spraying it with water or covering it with plastic sheeting.