A concrete mix of ratio 1:2:4 (cement:sand:aggregate) requires 8.84 bags of cement per cubic meter of concrete. For a mix of M20, the amount of cement required would be 1.77 cubic meters, which is equal to 15.06 bags of cement.
A concrete mix of ratio 1:2:4 (cement:sand:aggregate) requires 8.84 bags of cement per cubic meter of concrete. For a mix of M20, the amount of cement required would be 1.77 cubic meters, which is equal to 15.06 bags of cement.