Sign Up

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Have an account? Sign In
Continue with Facebook
Continue with Google
or use


Have an account? Sign In Now

Sign In

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Sign Up Here
Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have permission to ask a question, You must login to ask a question.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add post.

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Expert Civil Logo Expert Civil Logo
Sign InSign Up

Expert Civil

Expert Civil Navigation

  • Articles
  • QnA
  • Quizzes
Search
Ask A Question

Mobile menu

Close
Ask A Question
  • Articles
  • QnA
  • Quizzes
  • Home
  • Resources
    • PDF
      • Question Papers
      • Notes
      • E Books
      • Interview Ques.
    • Templates
    • Project Reports
    • Spreadsheets
    • PPTs
    • House Plans
  • Subjects
    • Estimation & Costing
    • Building Materials
      • ⮞ Aggregate
      • ⮞ Brick
      • ⮞ Cement
      • ⮞ Concrete
      • ⮞ Mortar
      • ⮞ Sand
      • ⮞ Steel
    • Building Construction
    • Geotechnical
      • ⮞ Foundation
      • ⮞ Geology
      • ⮞ Soil Mechanics
      • ⮞ Site Investigation
    • Environmental Eng.
    • Structural Eng.
      • ⮞ Structural Design
    • Earthquake Eng.
    • Transportation Eng.
      • ⮞ Railway
      • ⮞ Bridge
      • ⮞ Highway
      • ⮞ Tunnel
    • Construction Mgmt.
    • Water Resource Eng.
      • ⮞ Fluid Mechanics
      • ⮞ Irrigation
      • ⮞ Hydrology
      • ⮞ Hydraulics
    • Irrigation
    • Surveying
  • Software
    • Autocad
    • 3Ds Max
    • Staad Pro
  • Marketplace
Home| Questions|Q 85810
Next
In Process
aalan

Expert Civil Latest Questions

Oliva Jones
Oliva Jones
Asked: December 6, 20222022-12-06T22:29:55+05:30 2022-12-06T22:29:55+05:30In: Construction

How to calculate road construction cost in india?

  • 0
  • 0
  • 3 3 Answers
  • 1,069 Views
  • 0 Followers
  • 0
Answer
Share
  • Facebook

    3 Answers

    • Voted
    • Recent
    • Oldest
    • Random
    1. Vaibhav Verma
      Vaibhav Verma
      2022-12-07T13:48:59+05:30Added an answer on December 7, 2022 at 1:48 pm

      Calculating the cost of road construction depends on numerous factors such as the type of road, length of the road, soil conditions, local labor costs, materials used, and other considerations. Generally, the cost of constructing a 1 kilometer of road can range from about Rs. 2 million to Rs. 6 millRead more

      Calculating the cost of road construction depends on numerous factors such as the type of road, length of the road, soil conditions, local labor costs, materials used, and other considerations.

      Generally, the cost of constructing a 1 kilometer of road can range from about Rs. 2 million to Rs. 6 million in India, depending on the above factors.

      See less
        • 0
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp
    2. sudha academy
      sudha academy Beginner
      2025-01-28T16:29:14+05:30Added an answer on January 28, 2025 at 4:29 pm

      Calculating road construction cost in India involves considering several factors such as the type of road, materials, labor, location, and other specific requirements. Here’s a simplified approach: 1. Determine the Type of Road: National Highways (NH), State Highways (SH), Rural Roads, or Urban RoadRead more

      Calculating road construction cost in India involves considering several factors such as the type of road, materials, labor, location, and other specific requirements. Here’s a simplified approach:

      1. Determine the Type of Road:

      • National Highways (NH), State Highways (SH), Rural Roads, or Urban Roads – Each type has different standards and cost estimates.

      2. Design and Specifications:

      • Road width, length, number of lanes, road grade, and the type of surface (asphalt, concrete, gravel) all influence the cost.

      3. Material Costs:

      • Bitumen (for asphalt roads), Cement (for concrete roads), Gravel, Sand, and Aggregates: Prices for materials can vary based on the region.
      • Quality and grade of materials will also affect the cost.

      4. Labor Costs:

      • This includes the cost of skilled and unskilled labor, machinery operators, and supervisory staff.
      • Labor costs vary based on location, project scale, and labor unions.

      5. Machinery and Equipment Costs:

      • Heavy equipment like bulldozers, rollers, graders, and asphalt pavers may be required.
      • Renting or purchasing machinery adds to the overall cost.

      6. Land Acquisition:

      • If the road construction requires land acquisition or clearing, this can add substantial costs.

      7. Environmental and Regulatory Costs:

      • Permits, environmental clearances, and mitigation measures (such as drainage systems, wildlife protection) might be necessary.

      8. Cost Calculation Formula:

      A general formula for calculating road construction cost is:

      Total Cost=(Cost of Materials)+(Labor Cost)+(Machinery Cost)+(Land Acquisition)+(Miscellaneous Costs)\text{Total Cost} = (\text{Cost of Materials}) + (\text{Labor Cost}) + (\text{Machinery Cost}) + (\text{Land Acquisition}) + (\text{Miscellaneous Costs})Total Cost=(Cost of Materials)+(Labor Cost)+(Machinery Cost)+(Land Acquisition)+(Miscellaneous Costs)

      Costs are often given in terms of per kilometer or per square meter of road, with the unit cost depending on road type and region.

      9. Government Guidelines and Cost Estimation:

      • The Indian Roads Congress (IRC) and Ministry of Road Transport and Highways (MoRTH) provide guidelines and cost estimation methods for road construction projects in India.

      Example Estimate:

      • For a standard National Highway with 2 lanes and asphalt, the cost can range from ₹2 crore to ₹5 crore per kilometer (depending on terrain, location, and design complexity).

      Additional Considerations:

      • Maintenance Costs: Maintenance cost should be calculated separately and can include periodic resurfacing, repairing potholes, and upgrading road signs.
      See less
        • 0
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp
    3. Finacus Solutions
      Finacus Solutions Beginner
      2025-02-06T21:45:24+05:30Added an answer on February 6, 2025 at 9:45 pm

      Road construction cost in India depends on factors like material, labor, land acquisition, and project length. Estimate costs by calculating per-kilometer expenses, including excavation, pavement, and drainage. Government rates and contractor quotes provide accurate pricing. Use software for detaileRead more

      Road construction cost in India depends on factors like material, labor, land acquisition, and project length. Estimate costs by calculating per-kilometer expenses, including excavation, pavement, and drainage. Government rates and contractor quotes provide accurate pricing. Use software for detailed budgeting.

      See less
        • 0
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp

    You must login to add an answer.

    Continue with Facebook
    Continue with Google
    or use


    Forgot Password?

    Need An Account, Sign Up Here

    Related Questions

    • How do you handle changes or modifications to the original construction plan during the building pro
    • Why is white cement used in construction?
    • In a flat arch, the skew back is made to rest in an inclined position so as to make an angle .......
    • The bottom or lowermost horizontal part of a window frame is known as ?
    • The pitch of stair should never exceed ?
    aalan

    Sidebar

    Advertisement

    Subscribe

    Recent Posts

    • Vipin Chauhan

      Septic Tank Additives: Miracle Solutions or Money Wasters?

    • Vipin Chauhan

      Maximizing Your Budget: Why Dry Hiring a Dozer Makes Financial Sense

    • Vipin Chauhan

      The Role of Parging in Protecting Your Home’s Foundation

    • Vipin Chauhan

      A Beginner’s Guide to PVC Plumbing: What You Need to Know

    Advertisement

    Recent Questions

    • Varun Kumar

      How to draw arrow in autocad?

      • 2 Answers
    • Vipin Chauhan

      How to calculate cube test result for 7 and 28 days?

      • 1 Answer
    • Mahima Singh

      How many months in a year have 30 days?

      • 1 Answer
    • Varun Kumar

      How to edit layout in autocad?

      • 1 Answer

    Explore

    • Home
    • Resources
      • PDF
        • Question Papers
        • Notes
        • E Books
        • Interview Ques.
      • Templates
      • Project Reports
      • Spreadsheets
      • PPTs
      • House Plans
    • Subjects
      • Estimation & Costing
      • Building Materials
        • ⮞ Aggregate
        • ⮞ Brick
        • ⮞ Cement
        • ⮞ Concrete
        • ⮞ Mortar
        • ⮞ Sand
        • ⮞ Steel
      • Building Construction
      • Geotechnical
        • ⮞ Foundation
        • ⮞ Geology
        • ⮞ Soil Mechanics
        • ⮞ Site Investigation
      • Environmental Eng.
      • Structural Eng.
        • ⮞ Structural Design
      • Earthquake Eng.
      • Transportation Eng.
        • ⮞ Railway
        • ⮞ Bridge
        • ⮞ Highway
        • ⮞ Tunnel
      • Construction Mgmt.
      • Water Resource Eng.
        • ⮞ Fluid Mechanics
        • ⮞ Irrigation
        • ⮞ Hydrology
        • ⮞ Hydraulics
      • Irrigation
      • Surveying
    • Software
      • Autocad
      • 3Ds Max
      • Staad Pro
    • Marketplace
    aalan

    Footer

    • About Us
    • Contact Us
    • Privacy Policy
    • Write for Us
    • Add Post
    • Badges
    • Rules
    • FAQ
    • Quizzes
    • Market
    • Articles
    • Q&A

    © 2023 Expertcivil. All Rights Reserved