IN SLAB Quantity of steel required in slab per 1 cu.m of concrete: - As given volume of concrete 1 cu.m of slab. According to Thumb Rule Steel quantity required for RCC slab should be 1% of total volume of concrete, here steel density = 7850 kg/m3 So, quantity of steel in 1 cu.m of concrete slab = 0Read more
IN SLAB
Quantity of steel required in slab per 1 cu.m of concrete: –
Example: –
FOR COLUMN
Quantity of steel required in column per 1 cu.m of concrete: –
Example: –
FOR BEAM
Quantity of steel required in beam per 1 cu.m of concrete: –
Example: –
- calculate quantity of steel in beam having the length, width and thickness of beam is 10m × 0.25m × 0.25m.
- Calculate volume of concrete as 10m × 0.25m × 0.25m = 0.625 cu.m
- Calculate Steel quantity in beam as 2% of volume of concrete = 0.02× 7850× 0.625 = 99kg