1. Make sure the shotcrete pump is in a level position and that all safety measures are taken before operating it. 2. Connect the hoses to the delivery system, including the air and material lines. 3. Fill the hopper with dry shotcrete mix, making sure not to exceed the maximum fill line. 4. ConnectRead more
1. Make sure the shotcrete pump is in a level position and that all safety measures are taken before operating it.
2. Connect the hoses to the delivery system, including the air and material lines.
3. Fill the hopper with dry shotcrete mix, making sure not to exceed the maximum fill line.
4. Connect the power supply to the shotcrete pump’s control box.
5. Set your desired pressure and start the pump.
6. Adjust the speed of the pump based on your desired output and ensure the correct amount of water is added to the mix.
7. Start feeding the mix through the hoses, ensuring the material flow is consistent.
8. Monitor the output to ensure you are meeting the desired results.
9. When finished, shut down the pump, clear the hoses, and disconnect the power supply.
See less