Sign Up

Continue with Facebook
Continue with Google
or use


Have an account? Sign In Now

Sign In

Get Access to:

  • Ask & get answers from experts & other users
  • Play Quiz and test your skills
  • Free Download eBooks, Notes, Templates, etc.
  • Study Materials
  • Latest Articles

Sign Up Here
Continue with Facebook
Continue with Google
or use

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

Sorry, you do not have permission to ask a question, You must login to ask a question.

Continue with Facebook
Continue with Google
or use

Forgot Password?

Need An Account, Sign Up Here

Sorry, you do not have permission to add a post.

Continue with Facebook
Continue with Google
or use

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Expert Civil Logo Expert Civil Logo
Sign InSign Up

Expert Civil

Expert Civil Navigation

  • Articles
  • QnA
  • Spaces
  • Quizzes
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Articles
  • QnA
  • Spaces
  • Quizzes
  • Home
  • Resources
    • PDF
    • Spreadsheet
    • Template
    • Project Report
    • Question Paper
    • Presentation
    • Notes
    • House Plan
  • Subjects
    • Estimation
    • Surveying
    • Building Const.
    • Foundation
    • Irrigation
    • Geotechnical
    • Fluid Mechanics
  • Software
    • Autocad
    • 3Ds Max
    • Staad Pro
  • Marketplace
  • EC App
Home| Questions|Q 72271
Next
Answered
Mahima Singh
Mahima Singh
Asked: June 21, 20222022-06-21T23:16:42+05:30 2022-06-21T23:16:42+05:30In: Highway Engineering

Describe the detailed procedure of construction of water bound macadam road

  • 1
  • 1 1 Answer
  • 17 Views
  • 1 Follower
Answer
Share
  • Facebook

    Related Questions

    • Define ductility
    • Define stream line
    • What is the velocity of approach ?
    • Write down a Manning’s formula for discharge in open channel
    • Hydraulic press works on which principle ?

    1 Answer

    • Voted
    • Recent
    • Oldest
    • Random
    1. Best Answer
      Vipin Chauhan Professional
      2022-06-22T22:23:39+05:30Added an answer on June 22, 2022 at 10:23 pm

      The procedure of construction of water-bound macadam road:

      1. Preparation of The Foundation

      The foundation for receiving the new layer of W.B.M may be either the subgrade or subbase course. This foundation layer is prepared to the required grade and camber and the dust and other loose materials are cleaned.

      On the existing road surface, the depression & potholes are filled and the corrugations are removed.

      2. Provision of Lateral Confinement

      This can be done by constructing the shoulders to a thickness equal to that of the compacted W.B.M layer and trimming the inner sides vertically.

      3. Spreading of Coarse Aggregates

      The coarse aggregates are spread uniformly to the proper profile and even thickness upon the prepared foundation and checked by templates.

      4. Rolling

      After spreading the coarse aggregates properly, compaction is done by a three-wheeled power roller (6 to 10 tones) or equivalent vibrating roller.

      Starting at the margins and progressively moving towards the centre of the rod road, rolling is done until enough compaction is attained.

      Rolling on the super-elevated part began at the inner or lower edge of the pavement and eventually moved to the outer or upper edge.

      5. Application of Screenings

      Dry screenings are put progressively across the surface once the coarse aggregates have been suitably rolled, with trial rolling continuing as the screenings are spread. At the same time, brooming is being done.

      6. Sprinkling and Grouting

      The surface is sprayed with water, swept, then rolled after the screens are applied.

      7. Application of Binding Material

      Following the application of screens and rolling, binding materials are applied in two or more thin layers at a uniform and slow rate. The surface is sprayed with water after each application of the binding substance, and the wet slurry is swept with brooms to fill the spaces.

      8. Setting & Drying

      The W.B.M course is left to set overnight after the final compaction. The Hungry places are filled with screens or binding materials the next day, softly watered if needed, and rolled. There will be no traffic until the W.B.M layers have set and dried.

      • 0
      • Share
        Share
        • Share on Facebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp

    You must login to add an answer.

    Continue with Facebook
    Continue with Google
    or use

    Forgot Password?

    Need An Account, Sign Up Here

    Sidebar

    Advertisement

    Subscribe

    Recent Posts

    • Editorial Staff

      Five Reasons to Waterproof Concrete Construction Projects

    • Editorial Staff

      5 Types of Curtain Ideas : A Simple & Easy Guide For your Home Interior

    • Editorial Staff

      20 Different Types of Indian Marbles with Prices, Materials & Specifications

    • Editorial Staff

      3 Types of Manholes : The Ultimate Guide for Manholes, Purpose, & Importance

    • Editorial Staff

      27 Types of tables : A Comprehansive Guide for your Home Decor

    Advertisement

    Recent Questions

    • Mahima Singh

      Why did you choose construction management?

      • 1 Answer
    • Oliva Jones

      Can you lay stone over a concrete patio?

      • 1 Answer
    • Varun Kumar

      What is Ventilation of tunnels? Explain types of ventilation briefly

      • 1 Answer
    • Varun Kumar

      How to do an Environmental Impact Assessment?

      • 1 Answer
    • Naksha Expert

      what is quantity surveying?

      • 2 Answers

    Explore

    • Home
    • Resources
      • PDF
      • Spreadsheet
      • Template
      • Project Report
      • Question Paper
      • Presentation
      • Notes
      • House Plan
    • Subjects
      • Estimation
      • Surveying
      • Building Const.
      • Foundation
      • Irrigation
      • Geotechnical
      • Fluid Mechanics
    • Software
      • Autocad
      • 3Ds Max
      • Staad Pro
    • Marketplace
    • EC App

    Footer

    • About Us
    • Contact Us
    • Privacy Policy
    • Write for Us
    • Add Post
    • Badges
    • Rules
    • FAQ
    • Quizzes
    • Market
    • Articles
    • Q&A

    Install the Expert Civil app

    © 2022 Expertcivil. All Rights Reserved