The approximate costs for different materials that are used in construction are given below - The %age of cement cost should vary from 16 to 17%. The %age of sand cost should vary from 12 to 14 % The Aggregates cost %age should vary from 7 to 8%. The steel cost %age should varyRead more
The approximate costs for different materials that are used in construction are given below –
The %age of cement cost should vary from 16 to 17%.
The %age of sand cost should vary from 12 to 14 %
The Aggregates cost %age should vary from 7 to 8%.
The steel cost %age should vary from 24 to 26%.
The cost of Brickwork vary from 4 to 5 %
Cost of Paint should vary from 4 to 5%
Cost of tiles should vary from 7 to 8%
The Plumbing cost ≈ 5.5 %
Cost for Windows ≈ 2.5%
Cost of electrification ≈ 6%
Cost for Doors ≈ 3 to 4%