Introduction of Retrofitting of Buildings
There are many points which are introduced about Retrofitting of Buildings, let us discuss point by point
Some following Tests are conducted during Nondestructive Testing of Concrete
(i) Visual inspection
(ii) Rebound hammer test
(iii) Hammer strike
(iv) Impact echo test
(v) Ultrasonic pulse velocity test
(vi) Pull off test
(vii) Cover meters & rebar locators
For Nondestructive Testing on Structural Steel
(i) Visual
(ii) Ultrasonic testing
(iii) Radiography
(iv) Magnetic particle test
(v) Liquid penetrate test
(vi) Hardness
Note:- All mandatory details are available in attached pdf files please go and download then enjoy!
Contents of Retrofitting of Building Construction
- Concept of Various Terms Associated with Retrofitting
- Retrofitting of Buildings Structures Damaged Due to Earthquake
- Nondestructive Testing of Concrete
- Destructive Testing of Concrete
- Nondestructive Testing on Structural Steel
- Seismic Retrofitting of Reinforced Concrete Buildings
- External post-tensioning
- Active control system
- Exterior reinforcement of the building
- Exterior concrete columns
- Infill shear trusses
- Massive exterior structure
- Retrofitting Measures
- Renovating Steel framed buildings
- Renovating Concrete structural elements
- Evolution of building materials
- Masonry, stone, and adobe buildings
- Wood and timber
- Concrete
- Practice and design concepts
- Challenges of retrofitting historic fabric
- No penetration of building envelope
- Penetration without breakage
- Breakage with repair
- Innovative technologies for historic preservation
- Post-tensioning
- Base isolation
- Seismic Actions
- Seismic Resistance and Vulnerability
- Application to Buildings in the Village of Soaring
- Application to Buildings in the Village of Soaring
- Seismic Retrofit of G3 Building in India Tech
- Post-tensioned concrete walls
- Shear steel damper
- Seismic performance assessment
- Alternative Design Procedures
- Approved Foundation System.
- Pier Foundation System.
- Non-Continuous Perimeter Foundation Systems.
- Unreinforced Masonry Perimeter Foundation.
- Inadequate Sill Plate Anchorage.
- Inadequate Cripple Wall Bracing.
- Research for verification
Also DownloadÂ
- A to Z Formula of Civil EngineeringÂ
- Project Report on RCC Over Head Tank
- Secant Pile Construction Project ReportÂ
- Calculation of Bricks Excel SheetÂ
- Nano Technology in Construction
- Precast Construction Presentation
- Bamboo used as a construction material (PPT)
- Aerated Autoclaved Concrete (PPT)
- Civil Engineering Formulas E-BookÂ
- Prismatic Compass Surveying PDF Notes
- Project Report on Multi Storied Building
- Estimate of Materials and Labor Excel sheet Download
- Quality Control and Monitoring
An Excellent referral site for guidance books for Civil and Structural engineers. Good work. Be blessed. Do Good and Be Good.
Thanks for sharing this post. NVLN CONSTRUCTIONS PVT LTD is a provider of end to end building Restoration services to help clients to improve safety and longevity of structures. We have been relentlessly working on providing services in concrete repairs & rehabilitation works. NVLN is specialized in delivering services and solutions to help clients.